Trent Shopfitters complete installation of Chanel at Terminal 2 Heathrow Airport.
Posted on 18/06/2014
We are very proud to announce that we have completed the installation of a most challenging Chanel project at terminal 2 Heathrow.
A very detailed and cutting edge design for one of the most exacting clients was made more of a challenge by the difficult access and working restrictions set by Heathrow. Andy Guy our Projects Director navigated his way through and guided his men to produce another first class installation.